Campus Information

  • 3/9 - Power Shutdown

    The South Campus Infrastructure has several utility shutdowns scheduled for the week of Spring Break (March 9th to March 17th). These shutdowns are critical to helping the university create a resilient infrastructure system. 

    On March 9th the follwoing buildings will have power affected. 

    • Rome
    • Wilson
    • Snow
    • Rosebrooks

    This shutdown will be from 6am to 2pm

    For more information, contact: Ian Dann at ian.dann@uconn.edu