Beginning on Monday, June 16 approximately 80 Area 3 parking spaces at UConn Health will be blocked off for drain repairs and repaving. The work will occur in two (2) phases and continue through early August, weather permitting. Signage and barricades will be in place. Please use caution when travelling in these areas, and please plan accordingly for additional travel time if arriving during peak business hours.
Throughout the duration of the project alternative Area 3 parking will be available at 16 Munson Rd., 400 Farmington Ave. and 195 Farmington Ave.
Additional shuttle service will also be available between 6am and 8pm at these locations beginning on Monday, June 16. And as always, Route 1 (the night shuttle) runs until 12 Midnight and the driver will take you to these lots if you let them know when boarding the shuttle.
- Phase 1 Lot A5 - The project will begin in the lower portion of Lot A5 near the Academic entrance and is planned to continue for approximately 4 weeks through Friday, July 11.
- Phase 2 Lot L1 - After the completion of phase 1 the project will move to the lower portion of Lot L1 on UConn Health Blvd. and is planned to continue for approximately 4 weeks through Friday, August 8.
For reference here is the Parking Map, and the Shuttle Schedules.
Thank you for your patience and understanding while we make these improvements to our campus.
For more information, contact: Allan Peterson at apeterson@uchc.edu